Introduction to Cut-off Grade Estimation.

An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial return...

Full description

Saved in:
Bibliographic Details
Main Author: Rendu, Jean-Michel
Format: eBook
Language:English
Published: Littleton : SME, 2008.
Subjects:
Online Access:Click for online access

MARC

LEADER 00000cam a2200000Mu 4500
001 ocn609846004
003 OCoLC
005 20241006213017.0
006 m o d
007 cr n||---|||||
008 100427s2008 xx o 000 0 eng d
040 |a EBLCP  |b eng  |e pn  |c EBLCP  |d MERUC  |d OCLCQ  |d N$T  |d OCLCQ  |d OCLCF  |d OCLCQ  |d DEBSZ  |d OCLCQ  |d ZCU  |d VTS  |d ICG  |d OCLCQ  |d STF  |d DKC  |d OCLCQ  |d M8D  |d OCLCQ  |d K6U  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 535997865  |a 1087364204  |a 1264725348  |a 1297185755  |a 1297475375 
020 |a 9780873352840  |q (electronic bk.) 
020 |a 087335284X  |q (electronic bk.) 
035 |a (OCoLC)609846004  |z (OCoLC)535997865  |z (OCoLC)1087364204  |z (OCoLC)1264725348  |z (OCoLC)1297185755  |z (OCoLC)1297475375 
050 4 |a TN560 
072 7 |a TEC  |x 026000  |2 bisacsh 
049 |a HCDD 
100 1 |a Rendu, Jean-Michel. 
245 1 0 |a Introduction to Cut-off Grade Estimation. 
260 |a Littleton :  |b SME,  |c 2008. 
300 |a 1 online resource (115 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
505 0 |a Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation. 
505 8 |a CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusio. 
520 |a An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr. 
588 0 |a Print version record. 
650 0 |a Ores  |x Grading. 
650 0 |a Ores  |x Sampling and estimation. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Mining.  |2 bisacsh 
650 7 |a Ores  |x Grading  |2 fast 
650 7 |a Ores  |x Sampling and estimation  |2 fast 
758 |i has work:  |a An introduction to cut-off grade estimation (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCGpJM9JW3gxdMrfT8FrgJC  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |z 9780873352680 
856 4 0 |u https://ebookcentral.proquest.com/lib/holycrosscollege-ebooks/detail.action?docID=464596  |y Click for online access 
903 |a EBC-AC 
994 |a 92  |b HCD