Embedded Commissioning of Building Systems.

In today's digital, green, and consumer driven marketplace, it is critical to be knowledgeable about the latest approaches, tools and systems that can help you seamlessly and reliably conduct building performance verification assessments. This groundbreaking book provides you with a solid under...

Full description

Saved in:
Bibliographic Details
Main Author: Akin, Ömer
Format: eBook
Language:English
Published: Norwood : Artech House, 2011.
Subjects:
Online Access:Click for online access

MARC

LEADER 00000cam a2200000Mu 4500
001 ocn769343999
003 OCoLC
005 20240909213021.0
006 m o d
007 cr |n|---|||||
008 111226s2011 xx o 000 0 eng d
040 |a EBLCP  |b eng  |e pn  |c EBLCP  |d YDXCP  |d N$T  |d OCLCQ  |d DEBSZ  |d OCLCQ  |d OCLCO  |d OCLCQ  |d AGLDB  |d ZCU  |d MERUC  |d STF  |d OCLCQ  |d UUM  |d VTS  |d ICG  |d OCLCQ  |d DKC  |d AU@  |d OCLCQ  |d M8D  |d OCLCQ  |d K6U  |d OCLCO  |d OCLCQ  |d U3G  |d IEEEE  |d MHW  |d OCLCL 
019 |a 1087030485  |a 1388673987 
020 |a 9781608071487  |q (electronic bk.) 
020 |a 1608071480  |q (electronic bk.) 
020 |a 9781608071470  |q (print) 
020 |a 1608071472 
035 |a (OCoLC)769343999  |z (OCoLC)1087030485  |z (OCoLC)1388673987 
050 4 |a TH438.2 
072 7 |a ARC  |x 009000  |2 bisacsh 
049 |a HCDD 
100 1 |a Akin, Ömer. 
245 1 0 |a Embedded Commissioning of Building Systems. 
260 |a Norwood :  |b Artech House,  |c 2011. 
300 |a 1 online resource (310 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Print version record. 
505 0 |a Embedded Commissioning of Building Systems; Contents; Chapter 1 The Motivation for Building Evaluation; 1.1 Building Types According to Technology; 1.2 Costliest Building Failures; 1.2.1 Cost of Silent Failures; 1.2.2 The Most Expensive and Prevalent Market Commodity; 1.3 Building Evaluation; 1.3.1 Post-Occupancy Evaluation (POE); 1.3.2 Simulation-Based Evaluation; 1.3.3 Commissioning Building Energy Systems; 1.4 Emerging Practices and Opportunities; References; Chapter 2 Embedded Commissioning; 2.1 Commissioning Energy-Consuming Capital Projects. 
505 8 |a 2.1.1 Signifi cance of Energy Consumption in Capital Projects2.1.2 Building Commissioning (BCx); 2.2 Current Challenges and Opportunities in the AEC Sector; 2.2.1 Performance Emphasis; 2.2.2 Stakeholder Awareness; 2.2.3 Integration of Design and Operations of Capital Projects; 2.2.4 Building Information Modeling: The Digital Platform for CPD; 2.3 Dawning of a New Practice in the AEC Sector: ECx; References; Chapter 3 Institutional Structure and Practice of Building Commissioning in the Digital Era; 3.1 The Global Scope of Building Commissioning. 
505 8 |a 3.2 Institutional Structure in Building Commissioning3.2.1 European Union Countries; 3.2.2 Pacifi c Rim Countries; 3.2.3 BCx Standards in United States and Canada; 3.3 Emerging Requirements for BCx in the Information Age; 3.3.1 Modeling; 3.3.2 Standardization; 3.3.3 Interoperability; 3.3.4 Cost of Interoperability; References; Chapter 4 Product and Process Models for Building Commissioning; 4.1 The Need for Product and Process Models in Building Commissioning; 4.2 Capturing the Building Commissioning Process in a Flowchart; 4.2.1 Process Model Terminology; 4.2.2 BCx Process Description. 
505 8 |a 4.2.3 Signifi cance of the ECx Model4.3 Capturing Embedded Commissioning Information in the Product Model; 4.3.1 Identifying BCx Data; 4.3.2 Developing the Product Model; References; Chapter 5 Building Information Modeling: Current Practices in Building Evaluation Models and Updates; 5.1 Introduction; 5.2 Utilization of BIM in Evaluating Facilities During Preconstruction; 5.2.1 Using BIM for Energy Analysis During Design; 5.2.2 Using BIM in Building Code Compliance Checking; 5.3 Using BIM in Evaluating Facilities During Construction. 
505 8 |a 5.3.1 Using BIM for Coordination of Building Systems and Specialty Trades5.3.2 Use of BIM and 3D Imaging Techniques for Construction Quality Control; 5.4 Using BIM in Evaluating Facilities Throughout Their Life Cycle; 5.4.1 Utilization of BIM for Traditional Commissioning Activities; 5.4.2 Using BIM for Fault Diagnosis of Building Systems; 5.4.3 Using BIM in Planning of Maintenance Tasks; 5.5 Evolution of BIM and the Need for Information Updating; References; Chapter 6 As-Is Modeling: Capturing Existing Spatial Conditions Using Laser Scanners; 6.1 Introduction. 
500 |a 6.1.1 Sensors and Methods for Capturing As-Is Conditions. 
520 |a In today's digital, green, and consumer driven marketplace, it is critical to be knowledgeable about the latest approaches, tools and systems that can help you seamlessly and reliably conduct building performance verification assessments. This groundbreaking book provides you with a solid understanding of the underpinnings of embedded commissioning (ECx) as the overarching building evaluation approach. You find a review of significant and emerging approaches within ECx, including product models, process models, BIM (building information modeling), laser technology based modeling, mapping betwee. 
650 0 |a Building commissioning  |x Data processing. 
650 7 |a ARCHITECTURE  |x Methods & Materials.  |2 bisacsh 
758 |i has work:  |a Embedded commissioning of building systems (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCFx6yJ4R4xG9XwH3HJW6jC  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Akin, Ömer.  |t Embedded Commissioning of Building Systems.  |d Norwood : Artech House, ©2011  |z 9781608071470 
856 4 0 |u https://ebookcentral.proquest.com/lib/holycrosscollege-ebooks/detail.action?docID=829301  |y Click for online access 
903 |a EBC-AC 
994 |a 92  |b HCD