|
|
|
|
LEADER |
00000cam a2200000Mi 4500 |
001 |
ocn940510338 |
003 |
OCoLC |
005 |
20241006213017.0 |
006 |
m o d |
007 |
cr |n||||||||| |
008 |
160227s1995 dcu o 000 0 eng d |
040 |
|
|
|a EBLCP
|b eng
|e pn
|c EBLCP
|d OCLCQ
|d XFH
|d ZCU
|d MERUC
|d OCLCQ
|d OCLCO
|d OCLCQ
|d OCLCF
|d ICG
|d AU@
|d OCLCQ
|d DKC
|d OCLCQ
|d OCLCO
|d OCLCQ
|d OCLCO
|d OCLCL
|
019 |
|
|
|a 994597316
|
020 |
|
|
|a 9780309552981
|
020 |
|
|
|a 0309552982
|
020 |
|
|
|a 0309054389
|
020 |
|
|
|a 9780309054386
|
035 |
|
|
|a (OCoLC)940510338
|z (OCoLC)994597316
|
043 |
|
|
|a n-us---
|
050 |
|
4 |
|a TD898.118 ǂb A35 1996eb
|
049 |
|
|
|a HCDD
|
100 |
1 |
|
|a NRC, Committee on Decontamination and Decommissionin.
|
245 |
1 |
0 |
|a Affordable Cleanup? :
|b Opportunities for Cost Reduction in the Decontamination and Decommissioning of the Nation's Uranium Enrichment Facilities.
|
260 |
|
|
|a Washington :
|b National Academies Press,
|c 1995.
|
300 |
|
|
|a 1 online resource (323 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
588 |
0 |
|
|a Print version record.
|
505 |
0 |
|
|a Affordable Cleanup?; Copyright; Preface; Contents; Executive Summary; THE GDPS; D & D COST ESTIMATES; THE UNCERTAIN CONTEXT; Final State of the Sites; Disposal of Waste; Criteria for Release of Decontaminated Materials; The D & D Fund and Budgetary Uncertainties; Sequence of Plant Cleanup; Management of DUF6; RECOMMENDATIONS; Previous D & D Experience; Contracting and Management; Need for New Facilities; Waste Management; Regulatory Coordination; Coordinated Planning; Stakeholder Involvement; Prioritized Cost and Risk Reduction; D & D Technology Issues; Safeguards and Security; DUF6; 1 Introduction.
|
505 |
8 |
|
|a STUDY BACKGROUND AND OBJECTIVESTHE U.S. URANIUM ENRICHMENT ENTERPRISE; THE UNITED STATES ENRICHMENT CORPORATION; THE D & D FUND; THE CHALLENGES OF A D & D EFFORT; D & D COSTS; ORGANIZATION OF THE REPORT; REFERENCES; 2 The GDP Sites: Process, Facilities, Inventories, and Risks; THE GASEOUS DIFFUSION PROCESS; SITE DESCRIPTIONS; BUILDINGS AND EQUIPMENT; CONTAMINATION; Radiological Contamination; Nonradioactive Contamination; STORAGE OF DUF6; SITE DIFFERENCES; RISKS SUBSEQUENT TO GDP CLOSURE; CONCLUSIONS; REFERENCES; 3 Decontamination Processes; INTRODUCTION; NUCLEAR CRITICALITY.
|
505 |
8 |
|
|a URANIUM DEPOSIT REMOVALGaseous Removal of Deposits; Mechanical Removal; Aqueous Spray Removal; DECONTAMINATION OF CASCADE EQUIPMENT; Disassembly; Aqueous Decontamination; DECONTAMINATION OF SUPPORT SYSTEMS AND BUILDINGS; Radioactively Contaminated Support Systems; Radioactively Contaminated Interior Building Surfaces; Removal of Nonradioactive Hazardous Material; WASTE MANAGEMENT; CHARACTERIZATION; Radionuclide Measurement Techniques; Hazardous Nonradioactive Materials; AUTOMATION AND ROBOTICS; CAPENHURST TECHNOLOGIES; Removal of Uranium from the Capenhurst Enrichment Cascades.
|
505 |
8 |
|
|a Decontamination of Equipment from the Capenhurst CascadesDecontamination of Supporting Systems and Building Surfaces; Waste Management; Characterization; General Considerations; CIP/CUP TECHNOLOGIES; CONCLUSIONS AND RECOMMENDATIONS; General; Conclusions; Recommendations; Uranium Deposit Removal; Conclusions; Recommendation; Decontamination of Cascade Equipment; Conclusions; Recommendations; Decontamination of Support Systems and Buildings; Conclusion; Waste Management and Recycling; Conclusions; Recommendations; Characterization; Conclusions; Recommendation; Robotics; Conclusions.
|
505 |
8 |
|
|a RecommendationsREFERENCES; 4 Analyses of the D & D Cost Estimates for the GDPs; PREVIOUS COST ESTIMATES; The 1988 MMES Study; The 1991 Ebasco and TLG Estimates; Comparison of the Ebasco and TLG Estimates for the Five Process Buildings at the Oak Ridge GDP; SAIC Analysis of the Ebasco Estimate for DOE; IDENTIFICATION OF MAJOR COST ELEMENTS; TIME PROFILE OF INCOME AND EXPENDITURES FOR THE D & D FUND; ESTIMATING U.S. GDP D & D COSTS FROM CAPENHURST D & D COSTS; Capenhurst Plant Description; Capenhurst Project Description; Estimating Oak Ridge Costs by Scaling Capenhurst Costs.
|
500 |
|
|
|a The shippingport reactor d & d project.
|
546 |
|
|
|a English.
|
650 |
|
0 |
|a Radioactive waste sites
|x Cleanup
|z United States
|x Cost control.
|
650 |
|
0 |
|a Nuclear facilities
|z United States
|x Cost control
|x Decommissioning.
|
651 |
|
7 |
|a United States
|2 fast
|1 https://id.oclc.org/worldcat/entity/E39PBJtxgQXMWqmjMjjwXRHgrq
|
758 |
|
|
|i has work:
|a Affordable Cleanup?: Opportunities for Cost Reduction in the Decontamination and Decommissioning of the Nation's Uranium Enrichment Facilities (Text)
|1 https://id.oclc.org/worldcat/entity/E39PCXjh6vpdwYMPKYd68tFdwC
|4 https://id.oclc.org/worldcat/ontology/hasWork
|
776 |
0 |
8 |
|i Print version:
|a NRC, Committee on Decontamination and Decommissionin.
|t Affordable Cleanup? : Opportunities for Cost Reduction in the Decontamination and Decommissioning of the Nation's Uranium Enrichment Facilities.
|d Washington : National Academies Press, ©1995
|z 9780309054386
|
856 |
4 |
0 |
|u https://ebookcentral.proquest.com/lib/holycrosscollege-ebooks/detail.action?docID=3376986
|y Click for online access
|
903 |
|
|
|a EBC-AC
|
994 |
|
|
|a 92
|b HCD
|